55-58 Pall Mall

55-58 Pall Mall is being demolished to make way for high-quality commercial units and office spaces.

55-58 Pall Mall is being demolished to make way for high-quality commercial units and office spaces. The building has been owned by a long-term investor since 2009, who intends on holding the building for many more years to come.

The buildings are currently known as Quadrant House and Commonwealth House on Pall Mall, but the site also includes 2-5 Crown Passage.

The existing buildings suffer from disjointed floorplates, with differing floor levels, low ceiling heights and plentiful columns, together providing poor quality accommodation. The new building is designed to provide very high-quality, contemporary space for progressive occupiers.

The façade of 55-58 will be retained and renovated. The façade will be carefully dismantled from site, removed, cleaned, and stored, before being reinstalled in a slightly extended format towards the end of the project. Elsewhere, the massing and façade materials are designed to blend into the existing context. A mixture of façade materials is proposed and includes Portland stone, bronze, stained oak, glazed bricks, Welsh slate, and granite.